Random
Pic
|
Random
Qoute
The strength of the turbulence is directly proportional to the temperature of your coffee. — Gunter's Second Law of Air Travel
|
|
Right Wing XII 8/8/2006
 | nailers doing their job... |
I glued the leading edge ply on to the ribs with T-88. The fit was really nice with no stress any where. When attaching all the nailers I ensured that the whole wing was sitting flat and clamped on the bench and check the trammelling one more time for squareness, since attaching the ply at this stage makes the whole wing very stiff and rigid - if I had a slight twist in the wing, it would be now a permanent twist due to the bracing effect of the glued plywood.
Most of the nails in the nailing strips came out, except for about 8. These I just trimmed flush and sunk them in with a nail punch. Routering off the excess ply with a flush trimmer was pretty painless and quick. I then applied 2 coats of System3 Clear-Coat epoxy.
 trimming of the surplus... |  final clear-coat - looks nice... |
|
|
Latest
Pics
11/30/2013
Extending and repairing the nose bowl.....
11/22/2013
On arrival.....
|
Progress Diagram
|
 - Latest Stuff RSS Feed Reader
|
 - The Real News RSS Feed Reader
|
 Local TX Weather Georgetown Weather Advisory:
RSS Feed Reader
Overcast and 67 F. Winds: North at 10. Pressure: ". Humidity: 63%. Heat Index: . Updated: Apr 13 2021, 8:56 am.
|
|